In January-July of this year, a total of $ 666.2 million was planned to be disbursed, of which $ 399.7 million of foreign investments and loans, in practice, $822.5 million (123.4 percent of the plan) was disbursed, of which $ 600.0 million (150.1 percent of the plan) of foreign investments and loans.
In Tashkent, $ 1.5 billion will be disbursed in 2023, of which $ 994.7 million will be foreign investments and loans
In the first half of this year, it was planned to master $ 522.2 million under the program, of which $ 313.9 million of foreign investments and loans, and in practice $797.5 million (152.7% of the plan), of which $ 582.2 million of foreign investments and loans (185.5 percent of the plan).
Participants of the "Paris – Beijing along the Great Silk Road" international auto rally arrive in Karakalpakstan
- Hunting of rare wildlife banned from August 1
- Uzbekistan Foreign Minister Bakhtiyor Saidov discussed strengthening bilateral relations with President of India
- Two people dead in collision of firefighting helicopters in Greece
- Oil prices declined on global exchanges
- Embezzlement of liquefied gas cylinders valued at 1 billion UZS exposed in Takhtakupir district
An extortionist was detained in Tashkent, demanding 360 thousand dollars from an entrepreneur for the "settlement" of construction issues
- Saida Mirziyoyeva: Inclusion of Tashkent's modernist architecture sites in the UNESCO World Heritage List is a great victory for Uzbekistan
- Akhadjon Kimsanboyev crowned World Chess Champion
- President of Uzbekistan calls for expanding practical cooperation with Azerbaijan
- Proposals for reforming the pension system reviewed
- Mahalla should evolve into a hub of trust, support, and opportunity for its residents